- Overview
- Product Description
- Detailed Photos
- Product Parameters
- Packaging & Shipping
- Installation Instructions
- Company Profile
- Our Advantages
- FAQ
Basic Info.
Product Description
Wet scrubber tower media:
Plastic Polyhedral hollow ball is composed of two hemispheres which will form into a ball,and each hemisphere consists of a number of half fan-shaped leaves, the upper and lower leaves in a staggered arrangement. Each hemisphere's fan-shaned leaves is like an air-liquid contacting area. However, when fan-shaped leaves stack each other, it is very easy to form partial occlusion so as to stop air movement. but never cause bridging & hole effect phenomenon. Therefore, it can be used in sewage treatment, desulfurization of CO2 in power plant, desulfuration and purified water tower packing.
Typical Application:
Widely used in chlorine gas, oxygen removal,in addition to carbon dioxide absorption tower, exhaust gas purification towers, acid mist purification tower, and other environmental protection equipment
Technical Parameter:
Technical Parameter | ||||
Size mm | Specific area m2/m3 | Void rate % | Bulk number Pieces/m³ | Bulk Density Kg/m³ |
Φ25 | 460 | 90 | 64000 | 64 |
Φ38 | 325 | 91 | 25000 | 75 |
Φ50 | 237 | 91 | 11500 | 52 |
Φ76 | 214 | 92 | 3000 | 75 |
Φ100 | 330 | 92 | 1500 | 56 |
Trade Details:
Related Trade Information | |
HS Code | 3926909090 |
Package | 1: Two Super sacks on Fumigation Pallet 2: 100L plastic woven bag on Fumigation Pallet 3: 500*500*500 mm carton on Fumigation Pallet 4: Upon your requirement |
Process Method | Injection |
Material | PP,PVC,PFA,PE,CPVC,PVDF,PPS.PES,E-CTFE,FRPP and so on |
Typical Application | Widely used in chlorine gas, oxygen removal,in addition to carbon dioxide absorption tower, exhaust gas purification towers, acid mist purification tower, and other environmental protection equipment. |
Production time | 7 days against one 20GP container loading quantity |
Executive standard | HG/T 3986-2016 or refer to your detailed requirement |
Sample | Free samples within 500 Grams |
Other | Accept EPC turnkey,OEM/OEM,Mold Customization,Installation&Guidance,Test, Entrusted design service etc. |
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat
1:Automatic Intelligent warehouse
1.1 Allows auto handling and scanning of label info via OCR technology which integrated to Fxsino's warehouse system.
1.2 Magnetic Guidance Lurking AGV Unmanned vehicle can pick, deliver,yard all cargo to warehouse.
1.3: Connected with FXSINO EPR to fulfill warehouse process automation
1.4:Warehouse capacity is close to 80000 cbms
2:Intelligent management robot
2.1: 24 hours non-stop inspection against product's quality,package,worker's efficiency and so on .
2.2 Timely find equipment's failure and inform technical staff to repair
2.3.Face recognition technology will monitor workers working status and prevent irregularities by outsiders.
3:AR visual system+5G+MAS
3.1 Based on China Unicom mobile proxy server full coverage, Our customers can see the production status of orders in real time through AR glasses.
3.2 we can collect all data,include in product daily output, material consumption, warehouse real-time inventory, order progress and so on via 5G data platform.
4:Technical research and development capability
4.1 Through cooperation with co-partner named tianjin University,Zhejiang University of Technology,Nanchang University,Tsinghua University and so on,we can provide EPC to you. Meanwhile, to assist customers to resolve with facing problem.